Based on what some other guys are going through, it could be worse:

Preliminary Order Accepted, 2/5/05.
Accepted by GM, 2/7/05.
Accepted by Production Control, 2/8/05.
Import Vehicle Produced, 4/9/05.
Shipped from Port of Origin, 4/28/05.
Received at Port of Entry, 6/1/05.
Available to Ship, 6/2/05.
TRAIN WRECKS IN MIDDLE OF CORNFIELD 6/9/05
DENTS FILLED WITH BONDO 6/10/05
REPAINTED AT EARL SCHIEB 6/11/05
Rail Ramp Unload, 6/18/05.
Intermediate Delivery, 6/20/05.
Shipped, 6/21/05.
 